WHAT THE CLIENT SAID
“Our move from Birmingham to Wolverhampton was significant for our business and intrinsic to our growth. We were looking for a company who could handle all of our design and fit-out requirements with the flexibility to undertake additional projects that arose as a result of the relocation. We found the Teepee team to be proactive, innovative and efficient with their proposal which also translated to the high standard of service we received throughout the installation process. Highly recommended.”
– Chairman & Group Chief Executive
CHALLENGES
Alycidon was looking for a partitioning system which created a modern environment and offered sound attenuation properties. The new offices were located on the first floor of a self-contained unit, therefore, consideration had to be given to ensure that materials such as glass and plasterboard, could be delivered directly to the build area safely and efficiently.
HOW WE SUCCEEDED
Teepee produced a concept design which comprised of double glazed colour coded stud partitions fitted with part and full height manifestations, to provide privacy to individual offices and the boardroom. All dividing walls were constructed from solid stud partitions, decorated using a wipe-able wall covering to match the surrounding painted walls and reduce on-site installation.
Teepee’s project department co-coordinated all works which consisted of off-loading delivery vehicles by hand and transporting to the first floor, installing partitions and electrical works which included coordinating with Alycidon’s approved data contractor. On completion of works, any carpet tiles where re-laid, painted walls touched up and all waste was removed from the site.
OUR SOLUTION PROVIDED
- A modern office with partitions offering suitable privacy and sound attenuation.
- A concept drawing which enabled Alycidon to obtain landlord approval.
- Teepee’s fit-out service enabled Alycidon to use one supplier, without disruption to their daily operation.
- All Health and Safety issues in line with current CDM 2015 regulations were taken care of by Teepee.