<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Turnkey | Teepee Materials Handling</title>
	<atom:link href="https://teepee.co.uk/portfolio_type/turnkey-solutions/feed/" rel="self" type="application/rss+xml" />
	<link>https://teepee.co.uk</link>
	<description>Solutions for every environment</description>
	<lastBuildDate>Tue, 29 Oct 2024 14:06:05 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.0.2</generator>
	<item>
		<title>THE MARCHES CENTRE OF MANUFACTURING &#038; TECHNOLOGY</title>
		<link>https://teepee.co.uk/portfolios/the-marches-centre/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Wed, 28 Mar 2018 14:34:00 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=1803</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“<span class="s1">In Teepee, we found a true partner who could be trusted to deliver all aspects of the fit-out allowing us to focus our energies on other parts of the project. We were continually impressed with their ability to adapt to the changes and challenges that a large fit-out project presents and are pleased to confirm that the scheme was delivered on time and to budget.</span>”<br />
<em><strong>&#8211; Project Director</strong></em></p>
</div>
</div>
</div>
</div>
</div>
</div>

		</div>
	</div>
</div></div></div></div><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-6"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="subtitle">
<h4>CHALLENGES</h4>
</div>
<p>The renovation of the industrial unit involved the removal of an existing brick constructed office and toilet facility, the installation of a new concrete floor within the training facility and two new loading doors with the concrete yard. The client also wanted to create a smart first impression by fitting a glass-fronted entrance being accessed by a dedicated car park.</p>
<p>Internally, the existing office block was refurbished, new offices and classrooms were installed including walls, <a href="https://teepee.co.uk/services/suspended-ceilings/">suspended ceilings</a>, floor coverings and M&amp;E works.</p>
<p class="p1" style="margin-top: 18px;">Within the new training facility, Teepee constructed separate toilets, a locker room, rest area and a 200-seat auditorium. Within the impressive workshop a dedicated fabrication unit, foundry, lathe, metrology, milling, robotics and vehicle trimming sections were installed, including a CNC zone, designed for 3/5 axis machines.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<p>The Teepee team carried out a detailed site survey of the building and then worked in conjunction with the MCMT project team to produce initial concept layouts before finally agreeing to work drawings.</p>
<p>Before commencement of any work, an asbestos report of the building was undertaken, including obtaining building regulations approval and landlord’s permission.</p>
<p>To separate the new welfare and auditorium facilities from the workshop, a new 10-metre high one-hour fire-rated jumbo stud wall was erected. Within the welfare and auditorium area itself, breeze block and stud partition walls were installed to segregate different areas, including supplying two sets of bi-folding partition doors to allow local businesses to rent the auditorium area, for conferences or exhibitions.</p>
<p>In the training workshop, a <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a> was constructed to locate all HVAC services and a metrology room was installed below to fully utilise the space. Finally, to sub-divide all other areas full and half-height double skin <a href="https://teepee.co.uk/warehouse-services/steel-partitions/">steel partitioning</a> were fitted.</p>
<p>When fitting out the new training facility, Teepee installed suspended ceilings, floor coverings, general lighting, high-level radiant heating and all electrical and mechanical supplies for machinery.</p>
<p>Due to the size of the project and the number of specialist machinery suppliers, we supplied a full-time onsite manager to oversee all works in conjunction with CDM Regulations 2015.</p>
<p class="p1" style="margin-top: 18px;">Throughout the process, regular onsite meetings were held with all contractors involved to ensure that the objectives of the Marches project team were continually met, including the implementation of any design changes.</p>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1803" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="1803" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=THE+MARCHES+CENTRE+OF+MANUFACTURING+%26%23038%3B+TECHNOLOGY&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1803" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="1803" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1803" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="1803" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1803&text=THE+MARCHES+CENTRE+OF+MANUFACTURING+%26%23038%3B+TECHNOLOGY" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="1803" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>

		</div>
	</div>
</div></div></div><div class="wpb_column vc_column_container vc_col-sm-6"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="subtitle">
<h4>OUR SOLUTION PROVIDED</h4>
</div>
<ul style="margin-top: 18px;">
<li>A 36,000 sq ft (3,346m2) state-of-the-art training facility including auditorium/exhibition room, training classrooms, offices, welfare facilities and a training workshop.</li>
<li>Specialist manufacturing and technology centre to provide training for apprentices and existing workforce.</li>
<li>Auditorium designed to allow local businesses to rent for conferences or exhibitions.</li>
<li>Acted as principle designer and contractor.</li>
<li>Obtained building regulation and landlord’s approval on the client’s behalf.</li>
</ul>

		</div>
	</div>

	<div class="wpb_video_widget wpb_content_element vc_clearfix   vc_video-aspect-ratio-169 vc_video-el-width-100 vc_video-align-center" >
		<div class="wpb_wrapper">
			
			<div class="wpb_video_wrapper"><iframe title="Case Study  - The Marches Centre of Manufacturing &amp; Technology" width="500" height="281" src="https://www.youtube.com/embed/3IRdCn90fXA?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe></div>
		</div>
	</div>
</div></div></div></div>
</div>The post <a href="https://teepee.co.uk/portfolios/the-marches-centre/">THE MARCHES CENTRE OF MANUFACTURING & TECHNOLOGY</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>George Taylor &#038; Co Lifting Gear (Midlands) Ltd</title>
		<link>https://teepee.co.uk/portfolios/george-taylor/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Mon, 17 Jul 2017 11:15:15 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=1211</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “In an industry such as ours, Health &#38; Safety considerations are of paramount importance and our chosen supplier needed to take this element very seriously. As a SEMA approved supplier, we knew that Teepee’s work would comply with the very latest industry and HSE standards which when combined with their professional<a href="https://teepee.co.uk/portfolios/george-taylor/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/george-taylor/">George Taylor & Co Lifting Gear (Midlands) Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“In an industry such as ours, Health &amp; Safety considerations are of paramount importance and our chosen supplier needed to take this element very seriously. As a SEMA approved supplier, we knew that Teepee’s work would comply with the very latest industry and HSE standards which when combined with their professional and thorough approach, inspired great confidence in their handling of the project. In particular, we were impressed by the level of detail applied to the calculation of <a href="https://teepee.co.uk/services/pallet-racking-systems/">racking</a> point loads and the care taken to ensure not only compliance but also optimal safety. The team were a pleasure to work with and we would not hesitate to recommend them to others”<br />
<em><strong>&#8211; Managing Director</strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper" style="padding-top: 15px;">
<p>The new facility consisted of a mezzanine floor with offices above and below, along with a first aid room and rest area facility located on the ground floor.</p>
<p>Before the relocation of the warehouse, GT Lifting required a dispatch warehouse to store a combination of handpicked goods, timber pallets and stillages.</p>
<p>Once completed, part of the existing racking could be re-located to create a new ‘bulk storage’ warehouse.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper" style="padding-top: 15px;">
<p>Firstly Teepee designed a new dispatch warehouse facility comprising of a new adjustable pallet racking system fitted with open boarded timber decking throughout, to enable a total of 5 different size timber pallets and steel stillages to be stored.</p>
<p>When storing goods of this nature, racking bay loads would exceed 15000 Kgs per bay, which generally surpasses standard concrete floor slab point loads. To overcome this issue, Teepee carried out floor slab tests to establish the strength of the concrete slab. On reviewing the results, Teepee installed spreader plates underneath all uprights, as this proved a more cost-effective solution than reinforcing the concrete slab. After the installation was finalised, GT Lifting began to migrate stock over from their existing warehouse.</p>
<p>After completion of the racking, Teepee designed and installed a <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a>. This design consisted of offices on both levels, enabling necessary departments to be in direct contact with operational staff. Additional features included a tea point facility on the first floor and a first aid room with general rest area located on the ground floor.</p>
<p>Once the new racking had been filled, Teepee were able to dismantle and re-locate existing racking to create a ‘bulk storage’ warehouse. While installing the existing racking, all damaged components were replaced, then on completion, all racks were commissioned and fitted with new load notice signs.</p>
<p>During the fit-out, Teepee co-ordinated with client’s chosen electrical, mechanical and building contractors.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
</div>
<ul style="margin-top: 18px;">
<li>A combination of 2113 No. pallet/stillage locations was created, accessible by both articulated and counterbalance forklifts.</li>
<li>Two storey office facilities fitted with suitable amenities.</li>
<li>Existing racking re-sited and commissioned to SEMA standards.</li>
<li>Pedestrian and end of aisle racking barriers fitted throughout, to comply with HSE / SEMA recommendations.</li>
<li>All works designed and installed to obtain Building Regulation approval.</li>
</ul>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1211" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="1211" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=George+Taylor+%26%23038%3B+Co+Lifting+Gear+%28Midlands%29+Ltd&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1211" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="1211" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1211" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="1211" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1211&text=George+Taylor+%26%23038%3B+Co+Lifting+Gear+%28Midlands%29+Ltd" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="1211" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/george-taylor/">George Taylor & Co Lifting Gear (Midlands) Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Contactum</title>
		<link>https://teepee.co.uk/portfolios/contactum/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Sun, 26 Feb 2017 21:49:47 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=861</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “We have been delighted with the solution that Teepee has delivered in response to our brief for increased warehousing, office and storage space at our new facility in Watford. This has allowed us to effectively meet the current needs of our business whilst providing us with the flexibility to adapt as<a href="https://teepee.co.uk/portfolios/contactum/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/contactum/">Contactum</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1"><span class="s1">“We have been delighted with the solution that Teepee has delivered in response to our brief for increased warehousing, office and storage space at our new facility in Watford. This has allowed us to effectively meet the current needs of our business whilst providing us with the flexibility to adapt as our operation grows. We can thoroughly recommend their services.”<br />
</span><em><strong><span class="s1">&#8211; Operations Director</span></strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">The existing office facility (7,316 sq ft or 680m2) required modernising to include an open plan office on the first floor for general sales and administration staff, individual offices for directors and managers, a large reception display area and a training room.</span></p>
<p class="p1"><span class="s1">Within the remaining space (9,385 sq ft or 914m2) Contactum needed a pick and pack area to house approx 1,100 SKU’s plus a bulk storage warehouse capable of storing 900 GKN pallet locations. </span></p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">Teepee removed and re-built<a href="https://teepee.co.uk/warehouse-services/office-partitions/"> office partitions</a> and suspended ceilings within the existing offices, to create open plan office space upstairs, with private offices fitted around the perimeter. Downstairs, a new reception area and training room were created. Teepee then re-decorated and installed new floor coverings throughout, including the installation of new LED lighting, re-positioning all small power and servicing of existing HVAC systems.</span></p>
<p class="p1"><span class="s1">Due to the limited space within the warehouse, Teepee’s design team decided to install a 2,851 sq ft (265m2) <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a>, which allowed two offices and one workshop to be housed on the first floor totalling 850 sq ft (79m2). The remaining space enabled assembly benches to be installed.<b> </b></span></p>
<p class="p1"><span class="s1">Underneath the mezzanine floor Teepee created a pick and pack area, which consisted of 6 packing stations and 95 bays of short-span shelving, designed to accommodate 1,140 SKU’s. </span></p>
<p class="p1"><span class="s1">Within the remaining space, we installed a warehouse office and a <a href="https://teepee.co.uk/services/pallet-racking-systems/">pallet racking system</a> capable of storing 926 No. 1200mm wide x 1000mm deep (GKN) pallet locations, operating in 1950mm wide aisles using an articulated forklift.</span></p>
<p class="p1"><span class="s1">We were also asked to install all new electrical and HVAC systems throughout the new assembly and warehouse facility.</span></p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
</div>
<ul>
<li class="li1"><span class="s2">A 7,316 sq ft (680m2) refurbished office facility including open plan offices on first floor, with a new reception and training room facility below.</span></li>
<li class="li1"><span class="s2">Installed new 2,851sq ft (265m2) mezzanine floor housing new assembly facility upstairs and a pick and pack facility on the ground floor, capable of storing 1,140 SKU’s. </span></li>
<li class="li1"><span class="s2">A new warehouse facility capable of storing 926 GKN pallet locations.</span></li>
<li class="li1"><span class="s2">Obtained building regulation approval on the client’s behalf.</span></li>
</ul>
</div>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D861" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="861" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=Contactum&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D861" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="861" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D861" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="861" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D861&text=Contactum" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="861" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/contactum/">Contactum</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hodge Hill Girls School</title>
		<link>https://teepee.co.uk/portfolios/hodge-hill-girls-school/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Wed, 22 Feb 2017 09:33:19 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=818</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “It has been a pleasure to work with Teepee on this refurbishment project which called for comprehensive management of complex and time-sensitive logistics. We have remained operational throughout saving us time and money, whilst also investing in new and efficient spaces that will enable the company to successfully progress.” &#8211; Site<a href="https://teepee.co.uk/portfolios/hodge-hill-girls-school/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/hodge-hill-girls-school/">Hodge Hill Girls School</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“<span class="s1">It has been a pleasure to work with Teepee on this refurbishment project which called for comprehensive management of complex and time-sensitive logistics. We have remained operational throughout saving us time and money, whilst also investing in new and efficient spaces that will enable the company to successfully progress.</span>”<br />
<em><strong>&#8211; Site Manager</strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p style="margin-top: 18px;">Time was of the essence with this project with a large proportion of the work requiring completion during the summer holidays to minimise disruption. Having obtained funding and governors’ approval in late June, HHGS required main construction work of foundations and <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a> to be carried out during this period to create a secure site. On commencement of a new school calendar year, Teepee was given a further 7 – weeks to complete the fit-out.</p>
<p>Teepee was awarded principle designer and contractor roles, including liaising with the local authority, to obtain building regulation approval on behalf of HHGS.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p style="margin-top: 18px;">We were proactive! During the tender process, Teepee produced outline designs to verbally obtain building regulation approval, before the commencement of works.</p>
<p>Due to tight deadlines and the nature of the project, our fit-out team removed staging, offices and a music room located within the assembly hall.</p>
<p>Unfortunately, due to the location of the hall on the school grounds, there was restricted access to get plant machinery in and out. Teepee hired mini diggers and dumper trucks to obtain access through a double access door approximately 200 meters away from the main car park, where skips had to be located. On completion of the concrete pads, Teepee offloaded and transported all steelwork through a set of double access door located at the rear of the assembly hall, including moving 12-metre long support steels on specially designed bogies.</p>
<p>On completion of the mezzanine floor, we located site fencing around site office and welfare facilities, to prevent school pupils from entering the build area.</p>
<p>Once pupils returned to school in September, Teepee carried out the internal fit-out. This comprised of installing fire-rated partitions, <a href="https://teepee.co.uk/services/suspended-ceilings/">suspended ceilings</a>, floor coverings, electrical, data, heating, ventilation and air conditioning (HVAC) services. We also fitted specially designed infill handrails to the main access staircase and perimeter walls of the first floor, to safeguard against pupils from falling onto the perimeter glass walls of the building.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
<ul>
<li>4175 sq ft (388m2) of additional floor space within the building.</li>
<li>Unlimited use of canteen facilities / break out area for pupils to access at all times.</li>
<li>First-floor assembly hall designed to hold up to 400 pupils.</li>
<li>Additional office and training facilities on the first floor.</li>
<li>Additional income obtained by renting out the first floor at evenings and weekends to support local community events.</li>
</ul>
</div>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D818" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="818" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=Hodge+Hill+Girls+School&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D818" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="818" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D818" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="818" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D818&text=Hodge+Hill+Girls+School" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="818" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/hodge-hill-girls-school/">Hodge Hill Girls School</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Hobbycraft</title>
		<link>https://teepee.co.uk/portfolios/hobbycraft/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Mon, 30 Jan 2017 16:12:00 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=788</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper"><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper"><div class="vc_btn3-container vc_btn3-inline vc_do_btn" ><a class="vc_general vc_btn3 vc_btn3-size-md vc_btn3-shape-rounded vc_btn3-style-3d vc_btn3-color-primary" href="https://teepee.co.uk/contact/" title="">Get in Touch with Teepee Today</a></div></div></div></div></div><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1"><span class="s1">“During the design and build of our Distribution Centre in Burton on Trent, Teepee Material Handling was proactive, helpful and informative at all stages from tender negotiation through to delivery and installation on site. Coordination between trades whilst working on site is always a challenge, yet Teepee worked through issues arising on-site to provide resolution with no effect to programme.”</span></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">The new distribution centre required a picking and pack facility to service replenishment stock for their retail outlets and online business. Within the remainder of the warehouse, a minimum of 15,000 pallet positions were required.</span></p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">To create a picking and pack facility, Teepee installed a single tier <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a> covering an area of 35,653 sq ft (3,315 m2), allowing retail stores to be serviced on the ground floor and online business orders to be processed on the first floor. </span></p>
<p class="p1"><span class="s1">Fitted to both ground and first-floor Teepee installed 1,178 bays of open type shelving 2000mm high x 500mm deep x 1000mm wide. On the first floor a further 19 bays of carton live storage having 3- roller beds in the height were installed to service fast-moving stock,<span class="Apple-converted-space">  </span>and two ‘Up and Over’ safety gates to enable bulk pallets to be loaded to platform to replenish shelving. </span></p>
<p class="p1"><span class="s1">Finally, once all online orders had been collated, Teepee installed a powered gravity roller conveyor around the process area, complete with an elevated belt conveyor for all orders to be transported on to the despatch area located on the ground floor. </span></p>
<p class="p1"><span class="s1">Within the remainder of the warehouse, Teepee installed two adjustable <a href="https://teepee.co.uk/services/pallet-racking-systems/">pallet racking systems</a>. The first area was a <a href="https://teepee.co.uk/warehouse-services/narrow-aisle-pallet-racking/">VNA racking system</a> designed to store a total of 15,625 bulk pallets, and the second area consisted of a wide aisle racking system capable of storing 3,896 pallet locations of fast-moving goods. </span></p>
<p class="p1"><span class="s1">In addition to the above Teepee installed end of aisle protection barriers to all extreme ends of the racking, safety mesh guarding to the rear of the racking, and a barcode labelling system to all racking and shelving systems throughout. </span></p>
<p class="p1"><span class="s1">During the fit-out, Teepee co-ordinated with client’s chosen electrical, mechanical and sprinkler contractors.</span></p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
<ul>
<li class="li1"><span class="s2">35,653 sq ft (3,315m2) single tier mezzanine floor installed to house online business. </span></li>
<li class="li1"><span class="s2">Powered roller and elevated belt conveyor system installed on first-floor mezzanine, to transported goods to despatch area located on the ground floor.</span></li>
<li class="li1"><span class="s2">Shelving installed on both ground and first-floor level to enable 25,000 SKU’s to be stored.</span></li>
<li class="li1"><span class="s2">‘Up and Over’ safety gates installed on mezzanine floor to enable bulk pallets to be loaded onto the platform to replenish shelving. </span></li>
<li class="li1"><span class="s2">VNA and <a href="https://teepee.co.uk/wide-aisle-pallet-racking/">wide aisle racking system</a> installed to provide 19,521 pallet locations.</span></li>
<li class="li1"><span class="s2">Full height safety screen attached to the rear of the racking, to prevent pallets falling onto workforce operating on the mezzanine floor.</span></li>
<li class="li1"><span class="s2">End of aisle barriers installed to protect the extreme ends of all racking, to comply with HSE / SEMA recommendations.</span></li>
<li class="li1"><span class="s2">Warehouse labelling system installed to all racking and shelving systems.</span></li>
</ul>
</div>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D788" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="788" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=Hobbycraft&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D788" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="788" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D788" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="788" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D788&text=Hobbycraft" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="788" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div></div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>

		</div>
	</div>
</div></div></div></div><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper"><div class="vc_btn3-container vc_btn3-inline vc_do_btn" ><a class="vc_general vc_btn3 vc_btn3-size-md vc_btn3-shape-rounded vc_btn3-style-3d vc_btn3-color-primary" href="https://teepee.co.uk/contact/" title="">Get in Touch with Teepee Today</a></div></div></div></div></div>
</div>The post <a href="https://teepee.co.uk/portfolios/hobbycraft/">Hobbycraft</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
