<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Mezzanine Flooring | Teepee Materials Handling</title>
	<atom:link href="https://teepee.co.uk/portfolio_type/mezzanine-flooring/feed/" rel="self" type="application/rss+xml" />
	<link>https://teepee.co.uk</link>
	<description>Solutions for every environment</description>
	<lastBuildDate>Thu, 09 Nov 2023 11:26:41 +0000</lastBuildDate>
	<language>en-GB</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.4</generator>
	<item>
		<title>A. Perry &#038; Co (Hinges) Ltd</title>
		<link>https://teepee.co.uk/portfolios/a-perry/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Mon, 02 Oct 2017 11:56:40 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=1423</guid>

					<description><![CDATA[]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>&#8220;Teepee were appointed to help us at a critical time for our business as we embarked on a complete fit-out of our new manufacturing and distribution warehouse. It was imperative that our team remained operational throughout the process and that our appointed contractor thoroughly understood the needs of our business. From the start, we were impressed with Teepee’s approach who listened carefully and made suggestions regarding the design that had previously not been considered. We benefitted from a full project management service which allowed us to concentrate on the day to day running of our company and at all times felt we were in safe hands. I would highly recommend their services <span style="line-height: 1.5;">&#8221;<br />
</span><em><strong>&#8211; Managing Director</strong></em></p>
</div>
</div>
</div>
</div>
</div>
</div>

		</div>
	</div>
</div></div></div></div><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-6"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="subtitle">
<h4>CHALLENGES</h4>
</div>
<p class="p1" style="margin-top: 18px;">Within the facility A. Perry required a new <a href="https://teepee.co.uk/warehouse-services/narrow-aisle-pallet-racking/">VNA racking</a> installation covering an area of 18130 sq ft (1,685 m2) designed to store picking and bulk storage pallet locations.</p>
<p>Situated opposite the VNA racking installation, the client also required a wide aisle <a href="https://teepee.co.uk/services/pallet-racking-systems/">pallet racking</a> operation, covering an area of 6,778 sq ft (630 m2) for the storage of non- standard pallets. This racking was to be dismantled from A. Perry’s old facility, inspected then re-installed and commissioned at the new facility.</p>
<p>Finally, two mezzanine floors were required covering a total area of 5,724 ft sq (532 m2), one to be used as a merchandise display area and the second for general storage of small handpicked goods.</p>
<p>All works needed to be coordinated around A. Perry’s daily business operations, working in conjunction with the clients approved electrical and mechanical contractors.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<p><span class="s1"><br />
</span>Firstly, Teepee designed a new VNA racking facility to replicate the existing onsite system, except for adding ‘pick and deposit’ stations (P&amp;D’s) fitted to one end. This enabled a standard forklift to load pallets onto the P&amp;D’s to maximize the efficiency of the VNA forklift. In addition to the above, fitted towards the rear of the racking, a 4,000mm wide ‘drive-thru’ bay was installed to reduced forklift travel time. Once Teepee explained to A. Perry the advantages of doing this, new specially designed P&amp;D racks were also fitted to the existing racking which was remaining in situ.</p>
<p>Before re-locating the existing racking and installing two new <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floors</a>, Teepee provided a concept layout of the complete warehouse facility. This enabled the management team to review current operations and with assistance from Teepee, provided an efficient and cost-effective design to future-proof the business minimising the need for unnecessary, costly alterations, in the event of future expansion.</p>
<p>During the installation of the new VNA and re-location of the existing racking system, Teepee installed end-of-aisle protection barriers to the extreme ends of all racks and ‘drive-thru’ sections, including fitting upright protection guards to any critical uprights. Not only did this provide a safe working environment for employees, but also reduced expensive repair costs.</p>
<p>Before commencing manufacture of the mezzanine floors, Teepee obtained Building Regulations approval on behalf of A. Perry, allowing the management team to concentrate on daily operations<span class="s1">.</span></p>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1423" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="1423" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=A.+Perry+%26%23038%3B+Co+%28Hinges%29+Ltd&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1423" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="1423" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1423" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="1423" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">1</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1423&text=A.+Perry+%26%23038%3B+Co+%28Hinges%29+Ltd" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="1423" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>

		</div>
	</div>
</div></div></div><div class="wpb_column vc_column_container vc_col-sm-6"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			<div class="subtitle">
<h4>OUR SOLUTION PROVIDED</h4>
<ul>
<li>VNA racking facility capable of storing over 9000 no. pallets.</li>
<li>P&amp;D’s fitted to existing racking to improve operational efficiencies and store an additional 52 no. pallets.</li>
<li>Existing racking re-sited and re-commissioned to SEMA standards to create an additional 770 no. pallet locations.</li>
<li>End of aisle racking barriers fitted throughout, to ensure the safety of employees and minimise repair costs.</li>
<li>Mezzanine floors provided an additional 5,734 sq ft (532 m2).</li>
</ul>

		</div>
	</div>
<div class="vc_empty_space"   style="height: 32px"><span class="vc_empty_space_inner"></span></div>
	<div class="wpb_video_widget wpb_content_element vc_clearfix   vc_video-aspect-ratio-169 vc_video-align-center" >
		<div class="wpb_wrapper" style="width: 90%">
			
			<div class="wpb_video_wrapper"><iframe title="Case Study – A.Perry &amp; Co" width="500" height="281" src="https://www.youtube.com/embed/tYvXmSWdRYw?feature=oembed" frameborder="0" allow="accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share" allowfullscreen></iframe></div>
		</div>
	</div>
</div></div></div></div><div class="vc_row wpb_row vc_row-fluid"><div class="wpb_column vc_column_container vc_col-sm-12"><div class="vc_column-inner"><div class="wpb_wrapper">
	<div class="wpb_text_column wpb_content_element" >
		<div class="wpb_wrapper">
			</div>

		</div>
	</div>
</div></div></div></div>
</div>The post <a href="https://teepee.co.uk/portfolios/a-perry/">A. Perry & Co (Hinges) Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>SciLabware Ltd</title>
		<link>https://teepee.co.uk/portfolios/scilabware-ltd/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Wed, 22 Mar 2017 22:29:35 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=1016</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “We were very impressed with Teepee’s approach to this project from the outset. Not only did they provide a cost-effective and efficient solution, they professionally integrated themselves with fellow suppliers to ensure that our client experience was as smooth and stress-free as possible. We would not hesitate to recommend them for<a href="https://teepee.co.uk/portfolios/scilabware-ltd/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/scilabware-ltd/">SciLabware Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“<span class="s1">We were very impressed with Teepee’s approach to this project from the outset. Not only did they provide a cost-effective and efficient solution, they professionally integrated themselves with fellow suppliers to ensure that our client experience was as smooth and stress-free as possible. We would not hesitate to recommend them for the provision of mezzanine floors and <a href="https://teepee.co.uk/warehouse-services/steel-partitions/">partitioning</a>.</span>”<br />
<em><strong>&#8211; Manufacturing Director</strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">If successful, Teepee would have to attend appropriate site coordination meetings, as well as producing working drawings, build schedules and supply requisite Method and Risk Assessments. During the fit-out, Teepee </span><span class="s2">were required</span><span class="s1"> to liaise with other successful suppliers, such as mechanical and electrical (M&amp;E), machine suppliers and flooring contractors.</span></p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">Having won the tender, Teepee’s project team carried out a detailed site survey and then produced relevant working drawings and a clear build schedule.</span></p>
<p class="p1"><span class="s1">The new production facility comprised a 4,261 sq ft (396m2) <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a> having a production office located on the upper level and a production facility below. Due to the overall size of the mezzanine floor, the underside of the structure required one-hour fire protection to comply with building regulations. Teepee then installed single skin steel partitions on both floor levels, which were shaped around the staircases to maximize space.</span></p>
<p class="p1"><span class="s2">In addition to the offices, a</span><span class="s1"> steel enclosure was installed around the stores to create a secure area. Within the solid partitions, Teepee installed a service hatch and one set of double action PVC doors, </span><span class="s2">which enabled Scilabware to access the stores&#8217; area picking and replenishing pallets from within the re-located <a href="https://teepee.co.uk/services/pallet-racking-systems/">pallet racking system</a>.</span></p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
</div>
<ul style="margin-top: 18px;">
<li class="li1"><span class="s2"> A mezzanine floor providing 4,261 sq ft of additional floor space.</span></li>
<li class="li1"><span class="s2"> Steel partitioning is chosen for cost and durability. </span></li>
<li class="li1"><span class="s2">Double action doors fitted to stores to allow forklift access.</span></li>
</ul>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1016" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="1016" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=SciLabware+Ltd&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1016" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="1016" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1016" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="1016" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1016&text=SciLabware+Ltd" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="1016" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/scilabware-ltd/">SciLabware Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Weatherite Group Ltd</title>
		<link>https://teepee.co.uk/portfolios/weatherite-group-ltd/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Wed, 22 Mar 2017 22:22:06 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=1015</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “Having worked with Teepee on several previous occasions, they were our first choice supplier when it came to the installation of additional mezzanine floors. As ever, their service was cost-effective, efficient and proactive, enabling us to continue working with minimal impact to our production schedule. Well done to the Teepee team<a href="https://teepee.co.uk/portfolios/weatherite-group-ltd/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/weatherite-group-ltd/">Weatherite Group Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“<span class="s1">Having worked with Teepee on several previous occasions, they were our first choice supplier when it came to the installation of additional mezzanine floors. As ever, their service was cost-effective, efficient and proactive, enabling us to continue working with minimal impact to our production schedule. Well done to the Teepee team on another excellent delivery.</span>”<br />
<em><strong>&#8211; Production Director</strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1">The project required a quick turnaround with little or no impact on productivity. Once delivered to site, Teepee agreed on an installation program to ensure there was minimal disruption to the client’s business.</span></p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;"><span class="s1" style="margin-top: 18px;">During the tender stage, a concept drawing of the <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floors</a> was provided, for which Building Regulations approval had been verbally obtained</span><span class="s2">.</span></p>
<p class="p1"><span class="s1">On receipt of the order, Teepee carried out a detailed site survey to enable the floor design to be completed. On approval, the mezzanine floor was issued for manufacturing and structural calculations were sent to our building inspector for formal approval.</span></p>
<p class="p1"><span class="s1">Before arrival onsite, Teepee issued relevant method statements and risk assessments following CDM regulations, which also included submission of a detailed installation plan.</span></p>
<p class="p2"><span class="s2">Once the mezzanine floor was erected, Teepee installed <a href="https://teepee.co.uk/warehouse-services/steel-partitions/">partitions</a>,<a href="https://teepee.co.uk/services/shelving/"> shelving</a> and mechanical and electrical services (M&amp;E). On completion of all works, the building inspector carried out his final onsite inspection, before final certificates being issued to the client.</span></p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
</div>
<ul style="margin-top: 18px;">
<li class="li1"><span class="s2">Additional 7,757 sq ft (721m2) of </span><span class="s3">storage space.</span></li>
<li class="li1"><span class="s2">Space below provided canteen, secure stores and production </span><span class="s3">areas.</span></li>
<li class="li1"><span class="s2">All floors fitted with safety gates to load palletised goods.</span></li>
<li class="li1"><span class="s2">Building regulations approval obtained on client’s behalf.</span></li>
</ul>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1015" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="1015" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=Weatherite+Group+Ltd&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1015" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="1015" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1015" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="1015" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D1015&text=Weatherite+Group+Ltd" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="1015" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/weatherite-group-ltd/">Weatherite Group Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>KMF (Precision Sheet Metal) Ltd</title>
		<link>https://teepee.co.uk/portfolios/kmf-precision-sheet-metal-ltd/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Wed, 22 Feb 2017 09:36:51 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=819</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID “Excellent service – Teepee worked seamlessly with our contractors to deliver a first-class solution that met challenging criteria. Their knowledge of Building Regulations and their professional and collaborative approach with existing suppliers has made this potentially complex process, easy.” &#8211; Purchasing &#38; Facilities Director &#160; CHALLENGES As space within the production facility<a href="https://teepee.co.uk/portfolios/kmf-precision-sheet-metal-ltd/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/kmf-precision-sheet-metal-ltd/">KMF (Precision Sheet Metal) Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>“Excellent service<strong> – </strong>Teepee worked seamlessly with our contractors to deliver a first-class solution that met challenging criteria. Their knowledge of Building Regulations and their professional and collaborative approach with existing suppliers has made this potentially complex process, easy.”<br />
<em><strong>&#8211; <span class="s1">Purchasing &amp; Facilities Director</span></strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p style="margin-top: 18px;">As space within the production facility was at a premium, Teepee opted to install a mezzanine floor nom 4800mm high. This would allow machinery to be located underneath the <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a>, meaning that braces would have to be strategically positioned to provide suitable stability.</p>
<p>The location of the mezzanine needed to be within the centre of the production facility. Normally, with structures of this nature, Building Control require a staircase 4500mm from a final exit, which was impossible to do in this scenario.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p style="margin-top: 18px;">Firstly, our design team consulted with the local Building Control department to discuss the issue of fire escape routes discharging 4500mm from a final exit. Due to the overall size of the structure, the Building Inspector was satisfied providing that a secondary route was installed. We then sat down with the KMF project team to establish suitable brace locations, which allowed us to design the mezzanine accordingly.</p>
<p>To meet KMF’s initial brief, Teepee also recommended and supplied a double skin steel <a href="https://teepee.co.uk/warehouse-services/office-partitions/">office partitioning</a> system. All partitions of this nature have a durable epoxy powder coated finish, ideal for a manufacturing or industrial facility, complete with an inert mineral wool infill to retain heat and provide suitable sound attenuation. To provide vision to all sides, a solid/glass/solid system 2700mm high was installed, having a self-supporting 600mm x 600mm suspended ceiling fitted at a height of 2400mm.</p>
<p>As the mezzanine floor was being used for work purposes, the underside of the platform was fitted with one-hour fire protection to comply with Building Control requirements. In addition to this, KMF electrical and HVAC contractors installed all relevant services in conjunction with Teepee build schedule.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
<ul>
<li>New 1,065 sq ft (99m2) first-floor production office.</li>
<li>Floor constructed over machinery not to impact on production space.</li>
<li>All partitions having suitable sound attenuation and a durable finish.</li>
<li>Building regulation approval obtained on client’s behalf.</li>
</ul>
</div>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D819" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="819" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=KMF+%28Precision+Sheet+Metal%29+Ltd&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D819" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="819" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">1</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D819" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="819" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D819&text=KMF+%28Precision+Sheet+Metal%29+Ltd" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="819" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
<div class="vc_row wpb_row vc_row-fluid"></div>
<div class="vc_row wpb_row vc_row-fluid"></div>
</div>The post <a href="https://teepee.co.uk/portfolios/kmf-precision-sheet-metal-ltd/">KMF (Precision Sheet Metal) Ltd</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
		<item>
		<title>Boss Design</title>
		<link>https://teepee.co.uk/portfolios/split-level-solution-makes-floor-space-work-harder/</link>
		
		<dc:creator><![CDATA[Richard]]></dc:creator>
		<pubDate>Thu, 25 Aug 2016 14:47:15 +0000</pubDate>
				<guid isPermaLink="false">https://teepee.co.uk/?post_type=portfolio&#038;p=494</guid>

					<description><![CDATA[<p>WHAT THE CLIENT SAID &#8220;Thanks to Teepee Materials Handling we have been able to truly maximize our working space and increase productivity. We were offered a choice of solution and were able to select the best option for us based on cost and minimum impact. We were impressed with the speed of service and their<a href="https://teepee.co.uk/portfolios/split-level-solution-makes-floor-space-work-harder/" class="more-link">Read More</a></p>
The post <a href="https://teepee.co.uk/portfolios/split-level-solution-makes-floor-space-work-harder/">Boss Design</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></description>
										<content:encoded><![CDATA[<div class="wpb-content-wrapper" id="wpb-content-root"><div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-12">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<h2>WHAT THE CLIENT SAID</h2>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p>&#8220;Thanks to Teepee Materials Handling we have been able to truly maximize our working space and increase productivity. We were offered a choice of solution and were able to select the best option for us based on cost and minimum impact. We were impressed with the speed of service and their experience in this sector is evidenced by their professional project management.<span style="line-height: 1.5;">&#8221;<br />
</span><em><strong>&#8211; Factory Manager</strong></em></p>
<div class="vc_row wpb_row vc_row-fluid">
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>CHALLENGES</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;">To supply and install two mezzanine floors, designed to cater for a concrete floor slab capable of supporting an imposed load of 30kN, as opposed to a standard floor capable of supporting 80kN. Due to the unit being rented, Boss Design required Teepee to obtain the landlord’s consent and Building Regulation approval.</p>
<div class="subtitle">
<h4>HOW WE SUCCEEDED</h4>
</div>
<div class="wpb_text_column wpb_content_element">
<div class="wpb_wrapper">
<p class="p1" style="margin-top: 18px;">Due to the complications concerning the concrete floor loadings, Teepee held discussions with the landlord’s surveyor. After obtaining this information, Teepee provided Boss Design with two concept layouts accompanied by budget prices.</p>
<p class="p1">The first layout indicated the mezzanine floor having mini floor piles, and the second indicated <a href="https://teepee.co.uk/services/mezzanine-flooring/">mezzanine floor</a> with larger base plates. Based on business disruption, lead time and price, Boss Design opted to go for the increased base plates. Once ordered, Teepee carried out a detailed site survey and produced final drawings for the landlord’s structural engineer to approve. At this stage and to save time, Teepee used their independent building inspector to approve all designs within two weeks.</p>
<p class="p1">Once approved by the landlord’s structural engineer, Teepee was in a position to order and manufacture materials for installation to be onsite within 4 weeks. Both floors were designed to withstand a load of 500 Kgs/m2, being fitted with a Part K and secondary utility steel staircases both fitted with identifiable stair nosings and twin-tube hand railing on both sides. Fitted to all exposed edges of the mezzanine floor, Teepee installed 1100mm high twin-tube hand railing complete with 100mm high kicker board. Finally, due to the first mezzanine floor being used for production purposes, Teepee fitted &#8216;one-hour&#8217; fire protection to the underside of the floor, including all support stanchions to comply with Building Regulations requirements.</p>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<div class="wpb_column vc_column_container vc_col-sm-6">
<div class="vc_column-inner">
<div class="wpb_wrapper">
<div class="subtitle">
<p>&nbsp;</p>
<h4>OUR SOLUTION PROVIDED</h4>
<ul>
<li>100% increase in production and storage capacity.</li>
<li>Floor designed to cater for imposed loads of machinery.</li>
<li>All floors fully demountable allowing easy relocation.</li>
<li>All landlord’s / building regulation approval obtained on the client’s behalf.</li>
</ul>
</div>
</div>
</div>
</div>
</div>
<p>&nbsp;</p>
</div>
<p>Share this Case Study: <div data-animation="no-animation" data-icons-animation="no-animation" data-overlay="" data-change-size="" data-button-size="1" style="font-size:1em!important;display:none;" class="supsystic-social-sharing supsystic-social-sharing-package-flat supsystic-social-sharing-spacing supsystic-social-sharing-content supsystic-social-sharing-content-align-left" data-text=""><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter googleplus" target="_blank" title="Google+" href="https://plus.google.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D494" data-main-href="https://plus.google.com/share?url={url}" data-nid="3" data-name="" data-pid="1" data-post-id="494" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-google-plus"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter linkedin" target="_blank" title="Linkedin" href="https://www.linkedin.com/shareArticle?mini=true&title=Boss+Design&url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D494" data-main-href="https://www.linkedin.com/shareArticle?mini=true&title={title}&url={url}" data-nid="13" data-name="" data-pid="1" data-post-id="494" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-linkedin"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter facebook" target="_blank" title="Facebook" href="http://www.facebook.com/sharer.php?u=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D494" data-main-href="http://www.facebook.com/sharer.php?u={url}" data-nid="1" data-name="" data-pid="1" data-post-id="494" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-facebook"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a><a data-networks="[]" class="social-sharing-button sharer-flat sharer-flat-1 counter-standard without-counter twitter" target="_blank" title="Twitter" href="https://twitter.com/share?url=https%3A%2F%2Fteepee.co.uk%2F%3Fp%3D494&text=Boss+Design" data-main-href="https://twitter.com/share?url={url}&text={title}" data-nid="2" data-name="" data-pid="1" data-post-id="494" data-url="https://teepee.co.uk/wp-admin/admin-ajax.php" rel="nofollow" data-mailto=""><i class="fa-ssbs fa-ssbs-fw fa-ssbs-twitter"></i><div class="counter-wrap standard"><span class="counter">0</span></div></a></div>
</div>
</div>
</div>
</div>
</div>
</div>The post <a href="https://teepee.co.uk/portfolios/split-level-solution-makes-floor-space-work-harder/">Boss Design</a> first appeared on <a href="https://teepee.co.uk">Teepee Materials Handling</a>.]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
